BAYBUL (12/27/05 1351)
FGUS56 KRSA 272149
RVFRN
ISSUED: TUE DEC 27 2005 146 PM PST
NEXT: TUE DEC 27 2005 800 PM PST
BULLETIN
RUSSIAN/NAPA RIVER FORECAST
CALIFORNIA NEVADA RIVER FORECAST CENTER, NATIONAL WEATHER SERVICE
AND THE CALIFORNIA DEPARTMENT OF WATER RESOURCES, SACRAMENTO, CA
ATTENTION...THE FOLLOWING STAGES OF PARTICULAR SIGNIFICANCE
HAVE OCCURRED OR ARE EXPECTED TO OCCUR
FLOOD STAGE
RUSSIAN RIVER AT HEALDSBURG
NAVARRO RIVER AT NAVARRO
HEAVY RAINFALL OVER THE NEXT 24 HOURS IS EXPECTED TO GENERATE
A MODERATE RISE ON THE NAVARRO AND RUSSIAN RIVERS. HEAVIEST
RAIN WILL OCCUR OVERNIGHT TONIGHT FOLLOWED BY SHARP RISE
WEDNESDAY MORNING. STAY TUNED FOR FORECAST UPDATES...
FORECASTS ARE BASED ON PRESENT AND FORECASTED METEOROLOGICAL
AND HYDROLOGIC CONDITIONS AT TIME OF ISSUANCE.
RUSSIAN RIVER AT
HOPLAND 1 PM STAGE 5.5 FT
FORECAST TO RISE TO NEAR 17.0 FT WEDNESDAY MORNING
WITH CONTINUED RISE EXPECTED
MONITOR STAGE 18.0 FT, FLOOD STAGE 21.0 FT
HEALDSBURG 9 AM STAGE 6.0 FT
FORECAST TO RISE ABOVE MONITOR STAGE EARLY WEDNESDAY MORNING
THEN FORECAST TO RISE ABOVE FLOOD STAGE NEAR NOON WEDNESDAY
THEN FORECAST TO RISE TO NEAR 20.0 FT WEDNESDAY AFTERNOON
WITH CONTINUED RISE EXPECTED
MONITOR STAGE 15.0 FT, FLOOD STAGE 19.0 FT
GUERNEVILLE BRIDGE 1 PM STAGE 13.2 FT
FORECAST TO RISE TO NEAR 26.0 FT NEAR NOON WEDNESDAY
WITH CONTINUED RISE EXPECTED
MONITOR STAGE 29.0 FT, FLOOD STAGE 32.0 FT
NAVARRO RIVER AT
NAVARRO 1 PM STAGE 9.8 FT
FORECAST TO RISE TO NEAR 23.0 FT WEDNESDAY MORNING
WITH CONTINUED RISE EXPECTED
FLOOD STAGE 23.0 FT
UNLISTED FORECAST POINTS ARE EXPECTED TO REMAIN BELOW MONITOR STAGE.
ALL THOSE AFFECTED BY RIVER CONDITIONS SHOULD REMAIN ALERT FOR
RAPID CHANGES AND FOR POSSIBLE FORECAST REVISIONS.
RKH
.AR HOPC1 20051227 P DH13/DC200512271345/HG 5.5 :OBSERVED
.ER HOPC1 20051227 P DH14/DC200512271345/HGIFEZZ/DIH03/ 7.4/ 9.3/ 11.2/ 13.2/
.ER1 15.1/ 17.0
.ER HOPC1 20051228 P DH07/DC200512271345/HIIFEZZ/DIH03/1 :CONT RISE EXPECTED
.AR HEAC1 20051227 P DH09/DC200512271345/HG 6.0 :OBSERVED
.ER HEAC1 20051227 P DH11/DC200512271345/HGIFEZZ/DIH03/ 7.5/ 9.0/ 10.5/ 12.0/
.ER1 13.5/ 15.0/ 16.3/ 17.7/ 19.0/ 20.0
.ER HEAC1 20051228 P DH16/DC200512271345/HIIFEZZ/DIH03/5 :CONT RISE EXPECTED
.AR GUEC1 20051227 P DH13/DC200512271345/HG 13.2 :OBSERVED
.ER GUEC1 20051227 P DH14/DC200512271345/HGIFEZZ/DIH03/ 14.8/ 16.4/ 18.0/ 19.6/
.ER1 21.2/ 22.8/ 24.4/ 26.0
.ER GUEC1 20051228 P DH13/DC200512271345/HIIFEZZ/DIH03/1 :CONT RISE EXPECTED
.AR NVRC1 20051227 P DH13/DC200512271345/HG 9.8 :OBSERVED
.ER NVRC1 20051227 P DH14/DC200512271345/HGIFEZZ/DIH03/ 12.0/ 14.2/ 16.4/ 18.6/
.ER1 20.8/ 23.0
.ER NVRC1 20051228 P DH07/DC200512271345/HIIFEZZ/DIH03/5 :CONT RISE EXPECTED
NNNN
BAYBUL.0052006